T‑7A Recapitalization
Environmental Impact Statement
Laughlin Air Force Base, Texas
Documents related to the Environmental Impact Statement (EIS) for T-7A Recapitalization at Laughlin Air Force Base (AFB) are available here for downloading or online browsing.
The following materials were developed as part of the public scoping process. The public scoping period ended on February 17, 2023.
The Laughlin AFB T-7A Recapitalization Draft EIS can be downloaded from the links below.
Executive Summary of the Draft EIS
File 1: Executive Summary. This file is the executive summary of the Draft EIS. This file is approximately 1 megabyte.
Draft EIS
File 2: Draft EIS. This file is the Draft EIS and appendices. It contains the description of the Proposed Action and alternatives, affected environment, and environmental consequences. This file is approximately 41 megabytes.
Supporting Materials for the Draft EIS
File 3: Detailed ACAM Reports. This file contains additional air quality analysis supporting documentation, including the detailed Air Conformity Applicability Model reports containing the air emission calculations. This file is approximately 7 megabytes.
A Notice of Availability for the Draft EIS was published in the Federal Register on November 9, 2023. Notice of Availability
A Notice of Availability for the Draft EIS and notice of the public hearings was published in English and Spanish in The Del Rio and Eagle Pass News Leader and The 830 Times. Newspaper Notice of Availability (English) & Newspaper Notice of Availability (en espanol)
The slide show for the December 5 and December 11, 2023 public hearings. Project Presentation
The posters shown at the December 5, 2023 in-person public hearing.
An informational brochure about T-7A recapitalization. Informational Brochure (English) & Informational Brochure (en espanol)
A downloadable comment form is available for printing and mailing. Comment Form. See Provide Comments for further information.
The Final EIS will be posted here when it was made available to the public.